Casas Arroyo de Sonoita
Design Review Process
Appendix A
To: The Architectural Review Committee
Casas Arroyo de Sonoita
From: _____________________________, owners of Lot #____________
Re: Design Review
I (we), ____________________________________________
agree to abide with the following requirements, subsequent to the
issuance of approval from the Architectural Review Committee on the major
elements of our structure upon Lot #____ in Casas Arroyo de
Sonoita, and subsequent to the receipt of a building permit from
Santa Cruz County, Arizona.
- I (we) will submit to the Architectural Review Committee, before
construction of the affected item, samples of all colors and
materials, including windows and light fixtures, that will be used
for all exterior elements of the structure, or make other
arrangements with the Architectural Review Committee chairperson that may
include, but are not limited to photographs, visits to similar
sites, color chips, and display of the actual paint on a small
section of the actual structure.
___________
(initial)
- I (we) will submit to the Architectural Review Committee, before
issuance of an occupancy certificate from Santa Cruz County, a
written (or drawn) revegetation plan for all disturbed areas that
includes the following:
- a list of species that will be used on the site
- a description of the process that will be used. Such
process should optimize chances of significant cover the first
year and vegetation density similar to adjacent similar
undisturbed sites by the end of the second summer rainy season
after planting.
- a timeline for re-vegetation activity designating
completion within the first March through July of the first year
after receiving occupancy of the dwelling, or finishing the
structural modification
- replacement of any shrubs or trees destroyed or
significantly altered during the construction process that were
not approved to be altered or destroyed by the Architectural Review
Committee on approved plans or in writing
- a description of the process that will be used to ensure
survival of replacement(s) of any shrubs or trees noted above
___________
(initial)
- Other requirements as agreed between the Architectural Review Committee
chairperson and the owner/builder. Each requirement is specified below
and initialed by both parties.
_________________________________ Date _________________
Lot Owner
_________________________________ Date _________________
Chairperson, Architecture Committee
Index Process Checklist Appendix A
Home
webmaster@kstrom.net
© 2001 Casas Arroyo Homeownwers Association